A new milestone, indeed.
The first photo was captured during the earlier stage of work where we called 'site clearing stage' where the appointed contractor have to clear out the site from whatever that is there and to achieve the desired platform level as per design and that was in early 2008. The second photo was captured in February 2012. It has now well developed and ready to be use. Am so proud to be part of what I would like to acknowledge as 'Malaysian history' as this is the third Sport School being built in Malaysia!